摘要 针对段家坪水平砂泥岩隧道钻爆法施工中存在的超欠挖问题,通过对钻爆参数的现场调试研究,不断修正与验证初始钻爆设计方案,重点对周边眼装药结构和装药量进行重新设计,将开发的新型聚能装药结构应用于周边眼。经过现场爆破试验,对爆破效果进行分析,证明聚能装药结构对于改善水平岩层爆破成型效果具有明显作用,可有效控制水平岩层的超欠挖。 In view of the over-under-excavation problems existing in the drilling and blasting construction of Duanjiaping horizontal sand mudstone tunnel, through the on-site commissioning and research on the drilling and blasting parameters, the initial drilling and blasting design scheme is constantly revised and verified, focusing on the redesign of the charging structure and charging amount of the peripheral hole, and the developed new shaped charge structure is applied to the peripheral hole. Through the field blasting test and the analysis of the blasting effect, it is proved that the shaped charge structure plays an obvious role in improving the blasting forming effect of horizontal rock stratum, and can effectively control the over-under-excavation of horizontal rock stratum.
作者 吕瑞虎 LV Rui-hu(China Railway Tunnel Consultants Co.,Ltd.,Guangzhou Guangdong 511458,China)
出处 《西部探矿工程》 CAS 2021年第12期156-160,共5页 West-China Exploration Engineering
关键词 水平砂泥岩 隧道 爆破 超欠挖 聚能穴 horizontal sand mudstone tunnel blasting over-under-excavation energy accumulation hole
  • 相关文献

参考文献5

二级参考文献44

共引文献47

同被引文献21

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部