基于风险的多区互联电力系统分布式鲁棒动态经济调度 被引量:15

Risk-based Distributed Robust Dynamic Economic Dispatch for Interconnected Multi-regional Power Systems
下载PDF
导出
摘要 为应对高比例可再生能源并网给调度运行带来的高不确定性,提出一种基于风险的两阶段鲁棒动态经济调度模型,可用于优化多区互联电力系统的联络线功率与区域发电及备用计划。在鲁棒优化模型中对所采用不确定集的边界进行优化,以评估弃风与失负荷风险。对联络线功率的优化包括两个方面:一是针对可再生能源预测出力制定基态联络线计划;二是针对实际可能出现的可再生能源出力制定功率调整计划,以实现区域备用共享。建立一种分布式调度体系,以实现各区域电力系统分散自治运行。采用动态乘子更新策略,避免了分布式优化算法参数选择的问题。在3区354节点系统上的算例分析验证了所提模型与算法的有效性。 In order to cope with the high uncertainty brought by the grid connection of high proportion of renewable energy to the dispatch operation,a risk-based two-stage robust dynamic economic dispatch model is proposed,which can optimize the tie-line power and regional power generation and backup plan for interconnected multi-regional power systems.The boundaries of the used uncertainty set in the robust optimization model are optimized to evaluate the risk of wind curtailment and loss of load.The optimization of tie line power includes two aspects.One is to formulate a base-state tie line plan for the forecasted power output of renewable energy.The other is to formulate a power adjustment plan for the actual possible renewable energy output to achieve regional backup sharing.A distributed dispatch system is established to realize the decentralized and autonomous operation of each regional power system.A dynamic multiplier update strategy is adopted to avoid the problem of parameter selection in the distributed optimization algorithm.Case studies on a 3-area 354-bus system demonstrate the effectiveness of the proposed model and algorithm.
作者 陈哲 王橹裕 郭创新 杨杰 郭逸豪 王胜寒 CHEN Zhe;WANG Luyu;GUO Chuangxin;YANG Jie;GUO Yihao;WANG Shenghan(Electric Power Research Institute of State Grid Zhejiang Electric Power Co.,Ltd.,Hangzhou 310014,China;College of Electrical Engineering,Zhejiang University,Hangzhou 310027,China)
出处 《电力系统自动化》 EI CSCD 北大核心 2021年第23期113-122,共10页 Automation of Electric Power Systems
基金 国家重点研发计划资助项目(2017YFB0902600) 国家自然科学基金重点资助项目(51537010) 国家电网公司科技项目(B311DS21000B)。
关键词 互联电力系统 动态经济调度 可再生能源 风险 鲁棒优化 分布式优化 interconnected power systems dynamic economic dispatch renewable energy risk robust optimization distributed optimization