摘要
江铜贵冶350t倾动炉自2003年8月建成投产以来,复杂原料日益趋升制约生产运行。倾动炉在生产实践中积累大量的经验后,从复杂原料配比和对作业周期的影响出发,分析影响因素,通过实践摸索改进操作手段,提高了倾动炉的作业效率,降低了重油单耗,实现了节能减排、降本增效的作用,助力于工厂“绿色冶炼”可持续发展。
Since the 350-ton tilting furnace was built and put into operation in August 2003 in Guixi Smelter of Jiangxi Copper,due to the increasingly rise of complex raw materials and the change of production technology,the production is restricted.After accumulating a great deal of experience in production practice,according to the influence of complex raw material proportioning and operation cycle,the influencing factors are analyzed.Through practice and operation,the operation efficiency of tilting furnace is greatly improved,the unit consumption of heavy oil is reduced,and the effect of energy-saving,emission-reducing,cost-reducing and efficiency-increasing is achieved,it is helpful to the sustainable development of"green smelting"of the factory.
作者
陈强
屈勇
CHEN Qiang;QU Yong(Guixi Smelter,Jiangxi Copper Corporation Limited,Guixi 335424,Jiangxi,China)
出处
《铜业工程》
CAS
2021年第5期44-48,共5页
Copper Engineering
关键词
冶炼工艺
低品位原料
倾动炉
生产
分析
smelting process
low-grade raw material
tilting furnace
production
analysis