门架驮梁纵移法架设高速铁路箱梁技术经济方案研究 被引量:1

Comparison and Cost Analysis of Longitudinal Shift Method of Gantry Beam and Cast-in-situ Method
下载PDF
导出
摘要 为了满足中国高速铁路大规模、高标准、高效的建设要求,中国开创性的广泛采用32 m和24 m跨度预应力混凝土简支箱梁及架桥机架梁。当出现高等级电力线路和高速铁路线路交叉,或者高速铁路线路下穿既有构筑.物时,经常会出现交叉净空无法满足常规架桥机作业要求的情况。本文将介绍一种新型的门架驮梁纵移落梁法架设高速铁路预应力混凝土简支箱梁的方案,并对这种新型工法进行技术经济方案研究。为解决交叉净空不足情况下的预应力混凝土简支箱梁架设问题拓展了解决思路。 In order to achieve the large-scale,high-standard,and efficient construction requirements of Chinas high-speed railway,China has widely adopted 32 m and 24 m span prestressed concrete simply supported box beams to achieve the requirements.However,when constructing high-speed railways in developed regions,high-level power lines and high-speed railway lines often intersect,or high-speed railway lines pass under existing structures.At this time,it often appears that the headroom cannot meet the requirements of the launching gantry.This article will introduce a new type of gantry piggy-back longitudinal beam dropping method for erection of prestressed concrete simply supported box beams,and compare the new construction method and the cast-in-situ method.It provides a solution for the erection of prestressed concrete simply supported box beams under the condition of insufficient headroom.
作者 陈宏智 CHEN Hong-zhi(China Railway Design Group Co.Ltd Institute of Engineering Economics,Tianjin 300308,China)
出处 《铁路工程技术与经济》 2021年第6期21-24,共4页 Railway Engineering Technology and Economy
关键词 门架驮梁纵移法 箱型梁 技术比较 投资分析 研究 Gantry piggy-back longitudinal beam dropping method Box beam Technical comparison Investment analysis Research
  • 相关文献

参考文献10

二级参考文献59

共引文献91

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部