塔吊基础作为承台基础及地下室底板基础的施工技术 被引量:2

Construction technology of tower crane foundation as cap foundation and basement floor foundation
下载PDF
导出
摘要 随着建筑业不断更新与发展,对质量、工期、成本的要求越来越严格,本文着重阐述基础施工阶段如何平衡临建与永久结构施工冲突的问题,主要从加快工期、节约成本角度出发,同时兼顾施工质量。 With the continuous renewal and development of the construction industry,the requirements for quality,construction period and cost are more and more strict.This paper focuses on how to balance the conflict between temporary construction and permanent structure construction in the foundation construction stage,mainly from the perspective of speeding up the construction period and saving costs,while taking into account the construction quality.
作者 阳文峰 齐雨迪 YANG Wenfeng;QI Yudi(China Construction Second Bureau First Construction Engineering Co., Ltd., Beijing 100176, China)
出处 《四川建材》 2021年第12期167-168,共2页 Sichuan Building Materials
关键词 临建 工期 成本 质量 施工技术 temporary construction time limit cost quality construction technology
  • 相关文献

同被引文献9

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部