3Aditya Parida. Success of Reliability Centered Maintenance Lies in Its Implementation: A Case Study. The 17th Euro-pean Maintenance Congress, Barcelona, Spain, 2004.
4Barlow R E,Hunter L C.Optimum preventive maintenance policies[J].Operations Research,1960,8(1):90-100.
5Sheu S H,Griffith W S,Nakagawa T.Extended optimal replacement model with random minimal repair costs[J].European Journal of Operational Research,1995,85(3):636-649.
6Lai K K,Leung F K N,Tao B,et al.Practices of preventive maintenance and replacement for engines:A ease study[J].European Journal of Operational Research,2001,124(2):294-306.
7Sheu S H,Griffith W S.Extended block replacement policy with shock models and used items[J].European Journal of Operational Research,2002,140(1):50-60.
8Pham H,Wang H Z.Imperfect maintenance[J].European Journal of Operational Research,1996,94(3):425-438.
9Malik M A K.Reliable preventive maintenance policy[J].AIIE Transactions,1979,11(3):221-228.
10Nakagawa T.Sequential imperfect preventive maintenance policies[J].IEEE Transactions on Reliability,1988,37(3):295-298.