华能福州电厂二期除灰控制系统改造施工方案优化

Optimization of Construction Scheme for Reconstruction of Ash Removal Control System in Phase Ⅱ of Huaneng Fuzhou Power Plant
下载PDF
导出
摘要 华能福州电厂二期3号、4号炉除灰系统控制系统改造,针对除灰系统运行特点,结合现场实际施工条件,优化施工方案,高效、安全地把控改造潜在风险,避免了3号、4号机组双停,缩短了改造工期。通过此次改造,解决了原有系统的安全隐患,取得了良好的效果。 For the transformation of the control system of the ash removal system of phase II#3 and#4 boilers of Huaneng Fuzhou power plant,according to the operation characteristics of the ash removal system and combined with the actual construction conditions on site,the construction scheme was optimized,the potential risks of the transformation were controlled efficiently and safely,the double shutdown of units 3 and 4 was avoided and the transformation period was shortened.Through this transformation,the potential safety hazards of the original system were solved and good results were achieved.
作者 陈林参 Chen Lin-can
出处 《电力系统装备》 2021年第20期70-71,共2页 Electric Power System Equipment
关键词 除灰控制系统改造 避免机组双停 施工方案优化 transformation of ash removal control system avoid double stop of the unit construction scheme optimization
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部