期刊文献+

同步顶升法修复桥梁支座调平块实例分析 被引量:5

The Case Analysis on Restoration of Bridge Bearing Leveling Block with Synchronous Jacking Method
下载PDF
导出
摘要 结合桥梁工程支座调平块修复实例,对同步顶升施工技术进行阐述。具体介绍了该技术在实际应用过程中的设备选择、主要施工工艺及修复后桥梁质量评价等,结果表明同步顶升技术可广泛运用于交通及相关领域,具有良好的社会效益及经济效益。 Combined with the bridge engineering support leveling block repair example,this paper expounds the synchronous jacking construction technology.This paper introduces the equipment selection,main construction technology and bridge quality evaluation of the technology in the process of practical application.The results show that the synchronous jacking technology can be widely used in transportation and related fields,and has good social and economic benefits.
作者 宋小峰 钱野 张强 SONG Xiaofeng;QIAN Ye;ZHANG Qiang(Nantong Construction Engineering Quality Supervision Station,Nantong Jiangsu 226618,China;Jiangsu Yuanping Garden Construction Co.,Ltd.,Taizhou Jiangsu 225300,China)
出处 《工程质量》 2021年第12期68-71,共4页 Construction Quality
关键词 桥梁工程 同步顶升 支座 调平块 监测 bridge engineering synchronous jacking bearing leveling block monitoring
  • 相关文献

参考文献4

二级参考文献17

  • 1赵煜,李春轩,张充满.在役连续刚构桥顶升技术及应用[J].长安大学学报(自然科学版),2007,27(4):52-56. 被引量:13
  • 2广东省公路勘察规划设计院股份有限公司.北江大桥拆除重建施工图变更设计[Z].广州:2011.
  • 3Chen Zhou, Quan sheng Yan, Heng-hin Zheng, et al. Experimental Research of Steel Bracket Jacking Used for Long Span Continuous Beam Bridge[C]//The 2012.International Conference on Civil Engineering, Archi- tecture and Sustainable Infrastructure. Zhengzhou: 2012.
  • 4Tong Guo, Erjun Wu, Aiqun Li, et al. Integral Lift- ing and Seismic Isolation Retrofil of Great Hall of Nan- jing Museum[J]. Journal of Performance of Construc- ted Facilities, 2012, (6): 558-566.
  • 5Y Zhao, J F Wang, M Pang. Integral Lifting Project of the Qifeng Bridge[J]. Journal of Performance of Constructed Facilities, 2012, (26):353-361.
  • 6段中星.北江大桥引桥同步顶升施工若干关键技术研究(硕士学位论文)[D].广州:华南理工大学,2012.
  • 7普里斯特利.桥梁抗震设计与加固[M].袁万城译.北京:人民交通出版社,1997.
  • 8公路桥梁板式橡胶支座(JT/T4—2004)[s].
  • 9公路桥涵养护规范(JTGHll-2004)[S].
  • 10徐晓亮,顾军,俞红升,程绍革.某单孔双曲拱桥加固改造方案对比[J].工程抗震与加固改造,2008,30(1):48-50. 被引量:1

共引文献35

同被引文献31

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部