摘要
通过对升船机承船厢4套上锁定装置结构的分析,将上锁定装置投退方式由原来人力推动改造为远程自动操作,再对该装置加装液压操作系统、电气控制系统及监控系统对接设施,以满足升船机上锁定装置远程控制投退的要求。
Through the analysis of the structure of the locking device on the 4 setsof the ship lift ship reception chamber,the on-off mode of the upper locking device is changed from manual driving to remote automatic operation.Then the device is equipped with hydraulic operation system,electrical control system and monitoring system docking facilities to meet the purpose of remote control on and off of the locking device on the ship lift.
作者
燕超
YAN Chao(Chongqing Datang International Pengshui Hydropower Development Co.,Ltd.,Chongqing 409600,China)
出处
《电工技术》
2021年第21期14-15,19,共3页
Electric Engineering
关键词
升船机上锁定
远程控制
液压操作
ship lift lock
remote control
hydraulic operating