为了能如期实现我国承诺的“碳达峰、碳中和”目标,最近国家能源局发布了我国的《抽水蓄能中长期发展规划(2021~2035年)》。规划不仅要求“十四五”期间我国新增投产的抽水蓄能装机几乎要超过以往50年的总量,而且还要求“十五五”期间,再翻一番。本文针对国家有关部门突然要如此高强度地加速抽水蓄能电站的建设问题进行必要的探讨。
In order to achieve China’s commitment of“carbon peak,carbon neutrality”as scheduled,the National Energy Administration recently released China’s“Pumped Storage Medium and long-term Development Plan 2021-2035”.The plan not only calls for the number of pumped storage units put into production during the 14th Five-year Plan period to almost exceed the total of the previous 50 years,but also calls for the number to double again during the 15th Five-year Plan period.Why should the relevant departments of the state suddenly accelerate the construction of pumped storage power station with such high intensity?This paper will make a necessary discussion on this issue.
作者
张博庭
ZHANG Boting(China Society Hydropower Engineering,Beijing 100044,China)
出处
《水电与抽水蓄能》
2021年第6期1-3,10,共4页
Hydropower and Pumped Storage
关键词
碳中和
能源革命
可再生能源
抽水蓄能
zero carbon emissions
energy revolution
renewable energy
pumped storage