摘要 郭二庄矿陷落柱比较发育,部分陷落柱是在勘探过程中发现的,存在的弊端是垂直钻孔揭露的陷落柱范围只能靠推断,范围控制性差。通过定向水平分支孔的施工,对施工中取得的岩屑、钻效、自然伽马曲线、消耗量等数据进行前后综合对比分析。确定异常岩屑、自然伽马、明显提高的钻效、消耗量可以准确的判断陷落柱在顺钻孔方向的起止范围及导水性,使煤矿对陷落柱的控制程度大大提高,对采煤过程中陷落柱的防水煤柱留设、治理起到积极指导作用。 The collapse columns were relatively developed in Guoerzhuang mine,some of which were discovered in the process of exploration.The disadvantage was that the range of the collapse columns exposed by vertical drilling hole could only be inferred and the range is poorly controlled.With directional horizontal branch hole constructed,data obtained in construction were compared and analyzed comprehensively all around,including rock debris、drilling efficiency、gamma ray curve and consumption.Collapse column starting and ending range and hydraulic conductivity in the drilling hole direction could accurately be determined by identifying abnormal rock debris、gamma ray、significantly improved drilling efficiency and consumption,which made the control degree of collapse column greatly improved in coal mine.The study played a positive guiding role in the collapse column waterproof coal pillar setting and management in the process of coal mining.
作者 苗利伟 胡建青 Miao Liwei;Hu Jianqing(The Second Hydrological team,China National Administration of Coal Geology,Xingtai 054000,China)
出处 《煤炭与化工》 CAS 2021年第11期45-47,共3页 Coal and Chemical Industry
关键词 陷落柱 岩屑 钻效 自然伽马 collapse column rock debris drilling efficiency gamma ray
  • 相关文献

参考文献1

二级参考文献5

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部