期刊文献+

JQ550型架桥机30‰大坡道架梁施工技术研究

Research on Construction Technology of 30‰Large Ramp Bridge Erection by JQ550 Bridge Erecting Machine
下载PDF
导出
摘要 在高速铁路大规模建设背景下,新建高铁与既有车站的联络线或动车走行线,往往采用单线箱梁形式跨越或下穿既有高铁线路。为保证净空要求,坡道设计越来越大,甚至达到了30‰,研究单线箱梁大坡道架梁技术势在必行。本文基于JQ550型架桥机,研究在±30‰坡道上架梁施工的技术,能够对今后铁路大坡道单线箱梁架设提供指导,降低大坡道架梁施工风险和施工难度,减少施工成本,具有重要的经济社会意义。 In the context of the large-scale construction of high-speed railways,connecting lines or moving trains between newly-built high-speed railways and existing stations often use single-track box girder to cross or underpass the existing high-speed railway lines.In order to ensure the clearance requirements,the ramp design is getting bigger,even reaching 30‰,it is imperative to study the technology of single-track box girder and large ramp.Based on the JQ550 bridge erecting machine,this article studies the technology of bridge erecting construction on±30‰ramps,which can provide guidance for the bridge erection of single-track box girder on large ramps in the future,reduce the construction risk and difficulty of bridge erection on large ramps,and reduce construction costs,which has important economic and social significance.
作者 陈志远 Chen Zhi-yuan(The 8th Engineering Co.,Ltd.of CTCE Group,Hefei 230041,Anhui Province,China)
出处 《建筑与装饰》 2021年第31期149-154,共6页 Construction & Decoration
关键词 JQ550型架桥机 30‰ 大坡道 过孔 架梁 JQ550 bridge erecting machine 30‰ large ramp via hole bridge erection
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部