摘要 重建的多诺水电站放空洞上平段钢衬背后出现渗漏现象,对上、下弯段的施工及洞室稳定造成不利影响。采用沉箱引排形成盖重再灌注特种材料的方法实现了封堵目标。系统叙述了封堵施工的情况以及渗漏水封堵后取得的效果。 Leakage occurs behind the steel lining of the upper flat section of the reconstructed venting tunnel of Duono Hydropower Station,which has an adverse impact on the construction of the upper and lower curved sections and the stability of the tunnel.Caisson drainage is applied to form cover weight first followed by grouting of special material to seal the leakage.This paper systematically describes the construction of sealing and the sealing effect of water leakage.
作者 周荣 晏宇 钟久安 ZHOU Rong;YAN Yu;ZHONG Jiu'an(PowerChina Chengdu Engineering Co., LTD, Chengdu, Sichuan, 611130;Ertan International Engineering Consulting Co., LTD , Chengdu, Sichuan, 611130;Sichuan Gotone Geotechnical Technology Co., LTD, Chengdu, Sichuan, 610073)
出处 《四川水力发电》 2021年第S01期75-79,共5页 Sichuan Hydropower
关键词 地下洞室 渗漏 沉箱引排 封堵技术 underground cavern leakage caisson drainage sealing technology
  • 相关文献

参考文献3

二级参考文献15

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部