以四川某风电项目为例,阐述了预应力锚栓笼及首节塔筒安装采用的施工方法,该施工方法取得了授权专利,方法虽然简单,但却发挥了大作用,助力98%的风机一次吊装成功,提升了整个风电场的工程建设质量,取得了可观的经济与社会效益,值得推广应用。
Taking a wind power project in Sichuan province as an example,this paper describes the construction method adopted for installation of pre-stressed anchor bolt cage and the first section of the tower.This simple construction method has been patented,it has played an important role in helping 98%of WTGs to be successfully hoisted and installed at one time,thus improving the construction quality of the whole wind power plant and achieving considerable economic and social benefits,which is worth promoting and applying.
作者
刘旭
夏美生
LIU Xu;XIA Meisheng(PowerChina Chengdu Engineering Co., LTD, Chengdu, Sichuan, 611130)
出处
《四川水力发电》
2021年第S01期80-83,共4页
Sichuan Hydropower
关键词
风机
预应力锚栓笼
首节塔筒
安装
WTG
pre-stressed anchor bolt cage
the first section of tower
installation