期刊文献+

缙山府项目涉笔架山河防洪综合评价与防治措施 被引量:2

Comprehensive Evaluation and Control Measures for Flood Control of Bijiashan River of Jinshanfu Project
下载PDF
导出
摘要 缙山府项目涉笔架山河建设内容包括桥梁工程、绿化工程、园建工程、给排水工程以及电气照明工程等,主体工程布置于现状笔架山河两岸堤岸上,未占用河道行洪断面。由于该项目位于笔架山河河道管理范围线内,根据河道管理范围内建设项目管理的有关规定,项目需要对涉河内容进行防洪评价。基于此,研究缙山府项目涉笔架山河的情况,综合评价防洪状况,并提出相关防治措施。 The construction of Bijiashan River involved in Jinshan fu project includes bridge engineering,greening engineering,garden construction engineering,water supply and drainage engineering,electrical lighting engineering,etc.the main works are arranged on the banks of the current Bijiashan River without occupying the flood discharge section of the river.As the project is located within the river management scope of Bijiashan River,according to the relevant provisions of construction project management within the river management scope,the project needs to conduct flood control evaluation on the river related contents.Based on this,this paper studies the situation of Bijiashan River involved in jinshanfu project,comprehensively evaluates the flood control situation,and puts forward prevention and control measures.
作者 杨秋萍 YANG Qiuping(Guangdong River and Sea Engineering Consulting Co.,Ltd.,Shenzhen Guangdong 518022)
出处 《河南科技》 2021年第23期91-93,共3页 Henan Science and Technology
关键词 缙山府项目 笔架山河 防洪综合评价 Jinshanfu project Bijiashan River comprehensive evaluation of flood control
  • 相关文献

参考文献4

二级参考文献30

共引文献24

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部