运营高速公路40m预制箱梁拆换施工技术研究

Research on construction technology of 40m precast box girder removal and replacement of operating expressway
下载PDF
导出
摘要 对于运营高速公路40m箱梁拆换施工,梁体的切割、吊装、运输、架设等受作业空间和环境的限制,增加了施工困难和风险,新旧箱梁在高速公路上的长距离运输为施工增加了成本和安全风险,同时也决定了箱梁拆换的总体进度。韩河大桥梁体拆换工程按期顺利实施完成,有效化解了以上问题,取得了良好的经济、社会效益。 There are many difficulties and risks in the construction of 40m box girder demolition and replacement of operating expressway due to the restriction of the working space and environment for cutting,hoisting,transportation and erection of the girder.The long distance transportation of the old and new box girder on the expressway increases the costs and risks for the construction,and determines the overall progress of the construction.The beam body demolition and replacement project of Hanhe Bridge is successfully completed on schedule,effectively solving the above problems and obtaining good economic and social benefits.
作者 张学诚 ZHANG Xuecheng(Gansu Province Highway Traffic Construction Group Co.,Ltd.,Lanzhou 730030)
出处 《中国建材科技》 CAS 2021年第6期128-129,75,共3页 China Building Materials Science & Technology
关键词 运营高速公路 切割 吊装 运输 梁体拆换 交通分流疏导 operating expressway cutting hoisting transportation beam body removal and replacement traffic diversion
  • 相关文献

参考文献9

二级参考文献46

共引文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部