摘要
对于运营高速公路40m箱梁拆换施工,梁体的切割、吊装、运输、架设等受作业空间和环境的限制,增加了施工困难和风险,新旧箱梁在高速公路上的长距离运输为施工增加了成本和安全风险,同时也决定了箱梁拆换的总体进度。韩河大桥梁体拆换工程按期顺利实施完成,有效化解了以上问题,取得了良好的经济、社会效益。
There are many difficulties and risks in the construction of 40m box girder demolition and replacement of operating expressway due to the restriction of the working space and environment for cutting,hoisting,transportation and erection of the girder.The long distance transportation of the old and new box girder on the expressway increases the costs and risks for the construction,and determines the overall progress of the construction.The beam body demolition and replacement project of Hanhe Bridge is successfully completed on schedule,effectively solving the above problems and obtaining good economic and social benefits.
作者
张学诚
ZHANG Xuecheng(Gansu Province Highway Traffic Construction Group Co.,Ltd.,Lanzhou 730030)
出处
《中国建材科技》
CAS
2021年第6期128-129,75,共3页
China Building Materials Science & Technology
关键词
运营高速公路
切割
吊装
运输
梁体拆换
交通分流疏导
operating expressway
cutting
hoisting
transportation
beam body removal and replacement
traffic diversion