摘要 近年来,经济快速发展,社会不断进步,电力行业发展迅猛,对于电力行业的要求也随之提高。因此,在进行输电线路的施工时,需要严格遵循施工工艺技术。本文针对输电线路的传统施工工艺技术,对其施工工艺方法及存在的问题进行了研究分析。本文研究成果对后续架空输电线路的施工工艺技术研究具有一定的参考意义。 In recent years,with the rapid economic development,continuous social progress,and rapid development of the power industry,the requirements for the power industry have also increased.Therefore,during the construction of the transmission line,it is necessary to strictly follow the construction process technology.In this article,the traditional construction process technology of power transmission lines,its construction process technology and existing problems have been researched and analyzed.The research results of this article have certain reference significance for the subsequent research on the construction process technology of overhead transmission lines.
作者 吴亮 裴宇豪 Wu Liang;Pei Yu-hao(State Grid Zhenjiang Power Supply Company,Zhenjiang 212000,Jiangsu Province,China)
出处 《科学与信息化》 2021年第31期130-133,共4页 Technology and Information
关键词 架空输电线路 传统施工 工艺技术 overhead transmission line traditional construction process technology
  • 相关文献

参考文献5

二级参考文献9

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部