华润置地贵阳九悦项目旋挖钻孔灌注桩基础施工中,根据岩溶地质条件下施工中遇到的不同问题,制订了技术应对措施和方法,可为类似工程提供参考。
In the construction of rotary drilling cast-in-place pile foundation in Guiyang Jiuyue project,according to the different problems encountered in the construction under karst geological conditions,the technical countermeasures and methods are formulated,which can provide reference for similar projects.