摘要
本文以昆明春之眼项目实际应用为例,详细阐述单塔多笼循环运行施工电梯施工关键技术,提升了施工效率,缩短了工期、降低了施工成本、提升了经济效益。
This paper took Kunming Eye of Spring project as an example to discuss in details the key construction technique for single-tower multi-cage circular operation construction lift,realizing favorable effects on the aspects of improving construction efficiency,shortening construction period,reducing construction cost and increasing benefits.
作者
张健
张豪
张蕊
ZHANG Jian;ZHANG Hao;ZHANG Rui(China Construction Second Engineering Bureau Co.,Ltd.,100010,Beijing,China)
出处
《建筑技术》
2021年第12期1480-1482,共3页
Architecture Technology
关键词
施工电梯
多笼循环
超高层建筑
construction lift
multi-cage circulation
super-high building