摘要
在装配式住宅中采用混合配筋预应力预制构件,必须研发出能够采用快捷的机械接头连接装置和加强抱箍连接装置,实现预制构件之间安全、可靠、环保、高效的快捷组装,达到装配式住宅预制构件装配施工时的混凝土零湿作业、高装配率。
In prefabricated houses,prestressed prefabricated components with mixed reinforcement are used,it is necessary to develop a fast mechanical joint connection device and strengthened hoop connection device,so as to realize the safe,reliable,environmental and high-efficiency fast assembledof prefabricated components,and achieve the zero humidity operation and high assembly rate of concrete during the assembly and construction of prefabricated components in prefabricated houses.
作者
李全民
王夫华
Li Quanmin;Wang Fuhua
出处
《江苏建材》
2021年第6期52-53,共2页
Jiangsu Building Materials
关键词
混合配筋
机械连接
快捷组装
灌浆套箍
mixed reinforcement
mechanical connection
quick assembly
grouting hoop