摘要 基于二次再热机组主辅系统的原理及特点,简要说明其与一次再热机组的共通及不同之处,并以某1000 MW二次再热机组为例,介绍机组启动调试过程中在鼓风效应控制逻辑、轴封漏汽、超高压缸叶片级压力控制器、机组暖机效率、汽轮机防抱死等方面存在的问题,经过分析论证后提出相应的建议措施。 Based on the principle and characteristics of the main and auxiliary systems of s double-reheat reheat units,this article briefly explains the common and different features of double-reheat reheat units and reheat units.Take a 1000 MW double-reheat unit as an example,introduce the problems in the blast effect control logic,shaft seal leakage,ultra-high pressure cylinder blad pressure controller,turbin warm-up efficiency,and turbine anti-lock during the startup and commissioning of the unit.After the analysis and demonstration,the corresponding proposed measures are put forward for the reference and reference of new double-reheat units of the same type.
作者 杨乐 张磊 YANG Le;ZHANG Lei(Northwest Electric Power Test Research Institute Co.,Ltd.of CEEC,Xi'an 710054,China)
出处 《电力勘测设计》 2021年第12期40-44,共5页 Electric Power Survey & Design
关键词 鼓风效应 轴封漏汽 叶片级压力控制器 暖机 防抱死 blast effect shaft seal leakage blad pressure controller turbin warming up anti-lock
  • 相关文献

参考文献3

二级参考文献12

共引文献18

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部