随着工程造价管理思想体系的逐步完善,全过程工程造价管理机制逐渐被全寿命周期的工程造价管理机制所取代。介绍了全寿命周期项目成本管理特点的基础知识,针对建设项目各个环节提出了项目成本控制的几种管理方法,以及最大限度地降低公路工程项目全寿命周期建设成本的建议。
With the gradual improvement of the ideological system of project cost management,the whole-process project cost management mechanism has been gradually replaced by the whole life-cycle project cost management mechanism.The basic knowledge of project cost management characteristics of the whole life cycle has been introduced,and several management methods of project cost control for each link of the construction project have been put forward,as well as suggestions for minimizing the construction cost of the whole life cycle of the highway project.