摘要
海底蕴藏着丰富的矿产资源,其价值是无法估计的。随着科学技术不断地发展,陆地的资源越来越匮乏,人类开始转向海洋底开采。随着海洋钻井平台的不断出现,深海采矿船也成为发展的趋势。本文介绍了立管输送系统在采矿船中应用,包括系统组成及工作原理。
With the continuous development of technology,land resources are becoming more and more scarce.The seabed has been rich in mineral resources,the value of which is impossible to estimate.Human beings turn to the ocean bottom mining.With the continuous appearance of offshore drilling platforms,deep-sea mining vessels have become the trend of development.The application,composition and working process of the riser delivering system in mining vessels are introduced.
作者
李霞
LI Xia(Fujian Mawei Shipbuilding Co.,Ltd.,Fuzhou 350501)
出处
《广东造船》
2021年第6期40-43,共4页
Guangdong shipbuilding
基金
工信部深海采矿船关键设备安装和总装联调技术研究(联装函(2016)548号)。
关键词
采矿船
立管
塔架
游车
Mining Vessel
Riser
Derrick
Traveling block