主轴密封结构改造及应用 被引量:2

Transformation and Application of Main Shaft Sealing Structure
下载PDF
导出
摘要 针对百龙滩水电站转轮主轴密封改造后出现的填料盘根使用时间短、漏水量过大、检修困难、影响效益等问题,笔者对存在问题的原因及主轴密封新结构的设计思路进行了分析,并经厂家技术人员模拟计算,最终确定了采用唇边密封结构的主轴密封改造方案。改造后解决了机组运行中存在的问题,且各项运行指标正常、稳定。该方案可在同类型机组的主轴密封改造中推广应用和给以借鉴。 In view of the problems such as short service time of packing,excessive leakage,difficult maintenance and impact on benefits after the transformation of the main shaft sealing of the runner in Bailongtan Hydropower Station,the author analyzes the causes of the existing problems and the design idea of the new structure of the main shaft sealing,and finally determines the transformation scheme of the main shaft sealing with lip seal structure through the simulation calculation of the manufacturer’s technicians.After the transformation,the problems existing in the operation of the unit are solved,and the operation indexes are normal and stable.The scheme can be popularized and used for reference in the transformation of main shaft sealing of the same type of units.
作者 姚育民 YAO Yumin(Dahua General Hydropower Plant of Guangxi Guiguan Electric Power Co.,Ltd.,Dahua,Guangxi,530800)
出处 《红水河》 2021年第6期139-142,共4页 Hongshui River
关键词 主轴密封 改造 盘根密封 唇边密封 水轮发电机 main shaft sealing transformation packing seal lip seal hydrogenerator
  • 相关文献

参考文献3

二级参考文献2

  • 1上海五金机械公司.实用五金手册[M].上海:上海科学技术出版社,1990..
  • 2大连工学院工程画教研室.机械制图[M].北京:高等教育出版社,1992..

共引文献1

同被引文献9

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部