工程技术人员在编制吊装方案时,如果对构件整体翻转竖立过程受力不了解,方案编制就无法突出编制重点。以某电厂钢栈桥大截面桁架柱构件整体吊装翻转为例,总结分析了吊装翻转过程荷载变化的特点,详细说明翻转过程各项参数数据,提出了大截面桁架柱构件整体吊装翻转过程中的注意事项,为工程技术人员在编制方案时提供参考和借鉴。
When the engineers and technicians prepare the hoisting scheme,if they don't understand the overall force condition in the lifting and fliping process of components,the scheme preparation cannot highlight the key points of preparation.Thus in this paper,taking the fliping and standing up of large section truss column members of a steel trestle in a power plant as an example,the characteristics of load change during the hoisting and fliping process are summarized and analyzed,and the parameter data in the turnover process is explained in detail;then precautions in the overall hoisting turnover process of large section truss column members are put forward,so as to provide references for the engineers and technicians in compiling the scheme.
作者
曾新明
于九生
齐子泰
ZENG Xin-ming;YU Jiu-sheng;QI Zi-tai(PowerChina Jiangxi Hydroelectric Engineering Bureau Co.,Ltd,Nanchang Jiangxi 330096,China)
出处
《机械研究与应用》
2021年第6期194-196,共3页
Mechanical Research & Application
关键词
翻转竖立
荷载变化
捆绑
吊装
flip and stand up
load fluctuation
binding
lifting