期刊文献+

基于DEM技术的黄河口拦门沙分析 被引量:3

Analysis of Sandbar at Yellow River Estuary Based on DEM Technology
下载PDF
导出
摘要 为了解近年来黄河口拦门沙发育情况,利用2017—2019年该区域水下地形数据,通过GIS建立DEM模型,分析区域淤积变化情况,发现黄河口拦门沙向西北和东北方向逐年发育,近口门处水下地形变化剧烈,来水来沙是形成拦门沙的主要因素。 In order to understand the development of the sandbar at the Yellow River estuary in recent years,this paper used the underwater topographic data of the area from 2017 to 2019 to build DEM model and analyze the regional sedimentation changes through GIS.It is found that the sandbar at the Yellow River mouth develops year by year to the northwest and northeast,the underwater topography near the entrance changes sharply and the incoming water and sediment are the main factors for forming the sandbar at the Yellow River estuary.
作者 左婧 高源 徐丛亮 ZUO Jing;GAO Yuan;XU Congliang(Shandong Hydrology and Water Resources Bureau,YRCC,Jinan 250100,China;Institute of the Yellow River Estuary and Coast Science,Dongying 257000,China)
出处 《人民黄河》 CAS 北大核心 2022年第1期33-36,共4页 Yellow River
基金 NSFC-山东联合基金资助项目(U1706214)。
关键词 黄河口拦门沙 淤积分析 DEM sandbar at Yellow River estuary siltation analysis DEM
  • 相关文献

参考文献11

二级参考文献47

共引文献90

同被引文献43

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部