期刊文献+

Analysis of an k-out-of-n:G system with redundant dependency and repair equipment procurement

原文传递
导出
摘要 This paper studies an k-out-of-n:G system with redundant dependency and repair equipment procurement lead time where the operating times and repair times of components follow exponential distributions and phase-type distributions,respectively.When one component breaks down,it is repaired by a repair equipment.The repair equipment may fail during the repair period and the following repair is not‘as good as new’.After a number of repairs,it is replaced by a new one.The new spare repair equipment for replacement is only available by an order,and the procurement lead time for delivering follows a phase-type distribution.Moreover,in the multi-component system,the redundant dependency is taken into account.Applying the matrix-analytical method,the system availability,the rate of occurrence of failures of the system,the expected number of broken components,the availability and the rate of occurrence of failures of the repair equipment are derived.Finally,numerical examples are given to show these theoretical results.
出处 《Journal of Control and Decision》 EI 2021年第4期403-414,共12页 控制与决策学报(英文)
基金 This research was supported by the National Natural Science Foundation of China[grantnumber 72001181],[grant number 71571127] the funding of V.C.&V.R.Key Lab of Sichuan Province(SCVCVR2019.05VS).
  • 相关文献

二级参考文献2

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部