摘要
水利工程项目较为复杂,包含了建筑、地质、地形、水文、施工等多个专业的协作,工程施工管理与控制难度较大,尤其是在工程设计阶段,需要对多方面的综合信息进行分析与沟通,实现工程技术与项目施工管理的相互协调。然而,传统的设计过程主要使用CAD技术,不利于信息共享、成本控制与进度管理等。论文简要介绍了BIM技术,探讨了BIM技术在水利工程设计咨询项目中的应用要点,以及在碰撞检查、工程量计算、造价计算中的应用,以供参考。
Water conservancy projects are more complex,including architecture,geology,topography,hydrology,construction and other professional cooperation,engineering construction management and control is difficult,especially in the stage of engineering design,it is necessary to analyze and communicate comprehensive information in many aspects,to realize the coordination of engineering technology and project construction management.However,the traditional design mainly uses CAD technology,which is not conducive to information sharing,cost control and schedule management.Based on this,this paper focuses on the implementation of BIM Technology in water conservancy engineering design consulting project for reference.
作者
陈家东
CHEN Jia-dong(Hainan Water Conservancy and Hydropower Survey,Design and Research Institute,Haikou 570203,China)
出处
《工程建设与设计》
2021年第24期103-104,115,共3页
Construction & Design for Engineering
关键词
BIM技术
水利工程
设计咨询项目
BIM technology
hydraulic engineering
design consulting project