摘要
公路运输是我国重要的运输方式,为了实现更高效率的运输,通过建设桥梁"拉曲成直"成为重要策略。目前,预应力简支T梁是桥梁建设的主要施工工艺,其施工过程的质量控制对于桥梁的施工质量具有重要的意义。论文以G340寨沟隧道改线工程为例,对预应力简支T梁的施工工艺及质量控制进行研究和分析,以期能为相关人员提供参考。
Highway transportation is an important mode of transportation in China.In order to achieve more efficient transportation,it has become an important strategy to build bridges to"bend it straight".At present,prestressed simply supported T-beams is the main construction technology of bridge construction,and the quality control of the process is of great significance to the quality of the bridge.This article takes the G340 Zhaigou Tunnel Rerouting Project as an example to study and analyze the construction technology and quality control of prestressed simply supported T-beams,so as to provide references for relevant personnel.
作者
刘涛
LIU Tao(Xingtai Road and Bridge Construction Group Co.Ltd.,Xingtai 054001,China)
出处
《工程建设与设计》
2021年第24期165-167,共3页
Construction & Design for Engineering
关键词
预应力
简支T梁
施工工艺
质量控制
prestress
simply supported T-beam
construction technology
quality control