在PPP模式下,政府对社会资本的监管提出了更高的要求,政府不仅需要以购买服务的方式为城镇排水与污水处理设施的顺利运营提供保障,还需要将风险转移与分担理念渗透到项目可行性研究、合同组织、招投标、融资、建设、运营、移交等多个阶段。为了解PPP模式背景下污水处理设施的建设与运维管理情况,论文介绍了PPP模式的理论基础、污水处理设施PPP建设项目,以及PPP模式背景下污水处理设施的建设流程,介绍了运营管理要点,并对运维管理效果进行了进一步探究,希望可以为PPP模式在污水处理设施建设项目中的有效应用提供参考。
Under the PPP mode,the government puts forward higher requirements for the supervision of social capital.The government not only needs to provide guarantee for the smooth operation of urban drainage and sewage treatment facilities by purchasing services,but also needs to infiltrate the concept of risk transfer and sharing into the project feasibility study,contract organization,bidding,financing,construction,operation,handover and other stages.In order to understand the construction,operation and maintenance management of sewage treatment facilities under the PPP mode,this paper introduces the theoretical basis of PPP mode,the PPP construction project of sewage treatment facilities and the construction process of sewage treatment facilities under the PPP mode,introduces the key points of operation and management,and further explores the effect of operation and maintenance management.It is hoped to provide reference for the effective application of PPP mode in sewage treatment facility construction projects.
作者
兰俊传
LAN Jun-chuan(China Railway Construction Eco-Environmental Co.Ltd.,Chongqing 400711,China)
出处
《工程建设与设计》
2021年第24期231-233,共3页
Construction & Design for Engineering
关键词
PPP模式
污水处理设施
社会资本
建设与运维管理
PPP mode
sewage treatment facilities
social capital
construction and operation and maintenance management