摘要
文章主要针对目前配网不停电作业中旁路电缆、临时电源电缆的敷设过程中存在的人力、物力和作业效率及安全等系列存在问题的研究,并应用于在配网旁路电缆展放敷设的特殊输送装置,并应用于现场实际的分析对比和论证;文章所设计的旁路电缆自动输送装置有有效地保证旁路电缆的技术要求,降低安全风险,提高作业效率和减轻一线作业人员劳动强度等具备良好的效果。
This article mainly focuses on the research on the manpower,material resources,work efficiency and safety problems that exist in the process of laying bypass cables and temporary power cables in the current distribution network without power failure,and is applied to the bypass cable exhibition in the distribution network.Lay the special conveying device,and apply it to the actual analysis and comparison and demonstration on the spot;the bypass cable automatic conveying device designed in this paper can effectively guarantee the technical requirements of the bypass cable,reduce safety risks,improve operation efficiency and reduce first-line operations The labor intensity of personnel has good results.
作者
应永灵
陈凯
Ying Yong-ling;Chen Kai
出处
《今日自动化》
2021年第12期51-52,共2页
Automation Today
关键词
旁路电缆
自动展放
安全
效率
bypass cable
automatic deployment
safety
efficiency