以津巴布韦Hwange电厂扩建400 kV输电线路工程为背景,针对拉V塔基础展开研究,主要包括基础构造特点、中心基础及拉盘的设计计算方法。
Based on the 400 kV Transmission Line of Zimbabwe Power Company 2X335MW Hwange Expansion Project,the research is carried out on the foundation of the Guyed-V tower,which mainly includes the characteristics of the basic structure,the design calculation method of the center foundation and the prefabricated plate.
作者
鄢本存
雷光杰
牛玉草
YAN Bencun;LEI Guangjie;NIU Yucao(Power China Henan Electric Power Survey&Design Institute Co.,Ltd.,Zhengzhou 450007,China;Power China Henan Engineering Co.,Ltd.,Zhengzhou 450001,China)
出处
《电工技术》
2021年第23期52-54,共3页
Electric Engineering
关键词
拉V塔
中心基础
拉盘
经济性
Guyed-V tower
central foundation
prefabricated plate