EPC工程总承包模式设计管理前期控制探讨 被引量:3

Discussion on Early Control of Design Management of EPC Project General Contracting Mode
下载PDF
导出
摘要 近年来,EPC工程总承包模式凭借其突出优势,逐渐成为国内主流之一。而设计管理作为EPC工程总承包模式的重要组成部分,与工程进度、质量及成本有着密切的关系。文章以深圳某EPC项目的设计实践为例,就EPC工程总承包模式设计管理前期控制进行探讨,以期提升EPC工程总承包模式设计管理水平。 In recent years,the EPC project general contracting model has gradually become one of the domestic mainstreams by virtue of its outstanding advantages.As an important part of the EPC project general contracting model,design management has a close relationship with the project schedule,quality and cost.Taking the design practice of an EPC project in Shenzhen as an example,the article discusses the early control of the design management of EPC engineering general contracting mode,in order to improve the design management level of EPC engineering general contracting mode.
作者 王洁明 张宇 郑昊腾 李余凡 高欢欢 WANG Jie-ming;ZHANG Yu;ZHENG Hao-teng;LI Yu-fan;GAO Huan-huan(South China Regional Company of China Construction First Bureau(Group)Co.,Ltd.,Shenzhen 518067,China)
出处 《价值工程》 2022年第2期54-56,共3页 Value Engineering
关键词 工程 总承包 管理 engineering general contracting management
  • 相关文献

参考文献2

二级参考文献2

共引文献22

同被引文献10

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部