浅谈塔尔2X660MW燃煤电站主厂房钢结构吊装工程的施工方法及工艺

Discussion on Construction Method and Technology of Steel Structure Hoisting Project of Main Power House in Thar 2X660MW Coal-Fired Power Station
下载PDF
导出
摘要 巴基斯坦塔尔2X660MW燃煤电站主厂房钢结构因其体型大、单根构件重、工期短、有着复杂的施工环境等,因而需要吊装施工质量达到较高水平。钢结构施工过程中主要的环节之一为钢结构吊装,而怎样分析实际情况,进行对比分析选择出适宜的吊装工艺方案则是吊装工作的基础,这对吊装质量也有直接决定作用。本文在此背景下从钢结构的吊装准备工作、钢结构吊装施工方法及工艺进行简要介绍。 The steel structure of the main power house of Thar 2X660MW coal-fired power station in Pakistan requires a high level of hoisting construction quality due to its large size,heavy single component,short construction period,and complicated construction environment.One of the main links in the steel structure construction process is the steel structure hoisting,and how to analyze the actual situation and select the appropriate hoisting process plan by comparison and analysis is the basis of the hoisting work,which also directly determines the quality of the hoisting.In this context,this article briefly introduces the steel structure hoisting preparation work,the steel structure hoisting construction method and technology.
作者 周立平 Zhou Li-ping(China Nuclear Industry 22ND Construction Co.,Ltd.,Wuhan 430051,Hubei Province,China)
出处 《建筑与装饰》 2022年第1期172-174,共3页 Construction & Decoration
关键词 钢结构 吊装 施工方法 施工工艺 steel structure hoisting construction method construction technology
  • 相关文献

参考文献6

二级参考文献15

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部