期刊文献+

深水半潜式生产平台整体倾斜试验技术研究及验证

Research and Verification of Inclining Test Technology for Deepwater Semi-Submersible Production Platforms
下载PDF
导出
摘要 深水半潜式生产平台是我国进军深水海洋石油开发的重要装备,建造阶段的倾斜试验是一项十分重要的试验。本文以我国自主研发建造的一座深水半潜式生产储油平台为例,详细介绍了该类型平台倾斜试验的技术关键点、试验方案、试验实施时关注点等,为后续该类型平台的倾斜试验提供参考。 Deepwater semi-submersible production platform is an important equipment for deepwater offshore oil and gas development in China.The inclining test is of great importance in the construction stage,which is different from the conventional ships and has its own characteristics.Taking a deepwater semi-submersible production and storage platform independently developed and built in China as an example»this paper introduces in detail the key technical points,test scheme,and focusing points during test implementation of the inclining test,which can provide reference for inclining test of this type of platform in the future.
作者 李勇 王嘉 朱传超 张庆营 李长亮 LI Yong;WANG Jia;ZHU Chuanchao;ZHANG Qingying;LI Changliang(Offshore Oil Engineering(Qingdao)Co.,Ltd.,Qingdao 266500,Shandong,China)
出处 《海洋工程装备与技术》 2021年第2期71-74,共4页 Ocean Engineering Equipment and Technology
关键词 深水 半潜式 生产平台 倾斜试验 deepwater semi-submersible production platform inclining test
  • 相关文献

参考文献4

二级参考文献19

共引文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部