期刊文献+

巴图塔站装车量与调车机配置关系研究

Research on the Relationship between Loading Capacity and Shunter Configuration in Batuta Station
下载PDF
导出
摘要 巴图塔站是包神铁路集团最大的装车站和重要的集疏运枢纽,专用线分布密集,作业组织繁忙,能力接近饱和。为进一步提升装车作业组织效率,保质保量地完成装车任务,同时经济合理地使用调车机,对各专用线的装车量和调车机运用情况进行了写实,从不同的角度分析了二者之间的关系,对不同装车条件下调车机的配置数量和利用率进行了测算,得出了具体的结果,为不同装车计划下调车机的配置提供依据。 Batuta station is the largest loading station and an important gathering and distribution hub of Baoshen Railway Group.The special lines are densely distributed,the operation organization is busy,and the capacity is close to saturation.In order to further improve the organization efficiency of loading operation,complete the loading task with quality and quantity,and use shunting machines economically and reasonably,this paper realistically describes the loading volume and shunting machine application of each special line,analyzes the relationship between them from different angles,calculates the configuration quantity and utilization rate of shunting machines under different loading conditions,and obtains specific results,which provides a basis for the configuration of vehicle adjustment machines in different loading plans.
作者 刘耀斌 LIU Yao-bin(CHN Energy Baoshen Railway Co.,Ltd.,Ordos 017000,China)
出处 《物流工程与管理》 2021年第12期92-94,91,共4页 Logistics Engineering and Management
关键词 巴图塔站 装车量 调车机配置 运输组织 Batuta station loading capacity load shunting machine configuration transportation organization
  • 相关文献

参考文献1

二级参考文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部