大直径灌注桩桩端后注浆技术在某高层建筑中的应用 被引量:2

Application of post grouting technology at pile end of large diameter cast-in-place pile in a high-rise building
下载PDF
导出
摘要 为节省工程造价,优化基础设计,充分发挥地基承载能力特性,在对某高层建筑大直径灌注桩全面施工前的试验桩阶段中,采用埋设桩身应力计的方式,测定桩身内力及桩端阻力,对常规工法施工与采用桩端高压注浆这两种不同施工工艺下桩基承载能力进行对比,分析两种施工工艺下灌注桩的承载能力特性。对比分析结果表明:桩端注浆能明显提高桩端土的端承力及注浆断面以上一定范围内的桩侧摩阻力,进而提高单桩竖向承载力,可为桩基设计优化提供依据。 In order to save the project cost and optimize the foundation design and give full play to the characteristics of foundation bearing capacity.The pile internal force and pile end resistance are measured by embedding pile stress meter in the test pile stage before the full construction of large-diameter cast-in-place pile of a high-rise building.The bearing capacity of pile foundation under two different construction processes of conventional construction method and pile end high-pressure grouting is compared.The bearing capacity characteristics of cast-in-place pile under the two construction processes are analyzed.The comparative analysis results show that pile end grouting can significantly improve the end bearing capacity of pile end soil and pile side friction within a certain range above the grouting section so as to improve the vertical bearing capacity of single pile.It provides a basis for pile foundation design optimization.
作者 郑宇 ZHENG Yu(Fujian Provincial Institute Of Architectural Design And Research Co.,Ltd,Fuzhou 350001)
出处 《福建建筑》 2021年第12期125-129,共5页 Fujian Architecture & Construction
关键词 灌注桩 桩端后注浆 桩身内力测试 承载力 Bored pile After grouting Pile internal force test The bearing capacity
  • 相关文献

参考文献3

二级参考文献14

共引文献65

同被引文献10

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部