在某大桥承台混凝土施工过程中,采取措施对混凝土的性能进行严格调控,应用自主研发的冷却水管对混凝土内部最高温度进行控制,使用智能化数字多回路温度巡检仪等监控元件进行了施工监测,大大地减少了混凝土承台开裂的风险,保证了混凝土结构的安全与稳定。
During the concrete platform pouring construction process,the concrete construction quality control was strengthened,the cooling water pipes were used to control the maximum temperature of the concrete,and the monitoring components such as intelligent digital multiloop temperature inspection instrument were used for construction monitoring.The risk of cracking of the concrete cap was reduced,and the safety and stability of the concrete structure were ensured successfully.
作者
杨朋
李建新
刘科强
王海峰
李星
Yang Peng;Li Jianxin;Liu Keqiang;Wang Haifeng;Li Xing(School of Civil Engineering and Management,Guangzhou Maritime University,Guangzhou,Guangdong 510725;Foshan Jianying Development Co.Ltd.,Foshan,Guangdong 528000)
出处
《江西建材》
2021年第12期96-98,共3页
Jiangxi Building Materials
基金
广东省高等教育教学改革项目“互联网+下以建筑材料为基础的港口航道与海岸工程应用型人才培养体系研究”(粤教高函[2020]20号)
轧制技术及连轧自动化国家重点实验室(东北大学)开放课题基金项目(2020RALKFKT008)
番海大桥工程路面施工质量监控服务(FS-KQII-H-[2020]008)
关键词
承台浇筑
大体积混凝土
温度控制
监测
Platform pouring
Mass concrete
Temperature control
Monitoring