摘要
文中以具体工程为案例,围绕满堂支架现浇箱梁施工技术展开探讨,提出关键的作业流程以及具体方法,结果表明,该高速公路桥梁工程的质量可靠,施工技术有参考价值。
This paper takes a concrete project as an example,discusses the construction technology of cast-in-place box girder with full support,puts forward the key operation flow and specific methods,and the results show that the quality of the expressway bridge project is reliable and the construction technology has reference value.
作者
张剑
Zhang Jian(Sinohydro Bureau 16 Co.Ltd.,Fuzhou,Fujian 350000)
出处
《江西建材》
2021年第12期182-184,共3页
Jiangxi Building Materials
关键词
高速公路
满堂支架
现浇箱梁
Highway
Full hall support
Cast-in-place box girder