摘要
在我国建设领域快速发展的背景下,先进的施工技术应用越来越普遍,其中利用浅埋暗挖法开展隧道施工能够在一定程度上提高隧道的施工效率和施工安全性。但是在施工过程中,地面沉降问题会影响施工质量。因此,需要对浅埋暗挖法隧道施工技术进行深入研究,探讨在隧道施工过程中地面沉降的具体情况,从而制订科学合理的沉降地面沉降量控制方案,确保施工作业顺利进行。
Under the background of the rapid development of China's construction field,various advanced construction technologies are more and more widely used.Among them,tunnel construction by shallow-buried excavation method can improve the efficiency and safety of tunnel construction to a certain extent.However,in the construction process,the problem of land subsidence will affect the construction quality.Therefore,it is necessary to conduct in-depth research on the construction technology of shallowburied tunnel and explore the specific situation of ground settlement during tunnel construction.Therefore,a scientific and reasonable settlement control scheme of the sinking ground can be formulated to ensure the smooth progress of the construction operation.
作者
徐继光
赵莉
Xu Ji-guang;Zhao Li
出处
《建筑技术开发》
2021年第24期46-47,共2页
Building Technology Development
关键词
浅埋暗挖法
隧道施工
地面沉降
控制框架
shallow buried and underground excavation method
tunnel construction
land subsidence
control framework