330MW机组锅炉水冷壁失效分析 被引量:2

Failure Analysis on Boiler Water Wall of 330MW Unit
下载PDF
导出
摘要 分析了某330 MW燃煤火电机组修后启动后发生的水冷壁泄漏事件。针对火力发电厂锅炉在进行水冷壁管更换过程中因焊接工艺不良引发的次生问题,从管理及工艺等方面提出了一些总结和建议,为同类型机组在遇到相似情况下制定防范措施提供参考。 A water wall leakage event occurred after the start-up post repair of a 330 MW coal-fired power unit is analyzed.In view of the secondary problems caused by the poor welding process in the replacement of water wall tubes of boilers in coal-fired power plants,several conclusions and suggestions are put forward from the aspects of management and process,so as to offer reference as formulating preventive measures for the same type of units in similar situations.
作者 王浩 马飞 WANG Hao;MA Fei(Huadian Qudong Power Generation Co.,Ltd.,Xinxiang 453000)
出处 《电力安全技术》 2021年第12期28-31,共4页 Electric Safety Technology
关键词 火电厂 锅炉 水冷壁 焊接工艺 coal-fired power plant boiler water wall welding technology
  • 相关文献

参考文献11

二级参考文献34

共引文献45

同被引文献20

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部