摘要
目前工程建设中,利用预应力管桩施工工艺有助于提升工程施工质量。本文通过博罗县巷口排涝站地基处理设计及施工实践,结合预应力管桩技术特点,详细介绍了施工工艺流程与具体质量控制措施,总结了施工技术难点和注意事项,以供参考。
In the current engineering construction,the use of prestressed pipe pile construction technology is helpful to improve the quality of engineering construction.Based on the foundation treatment design and construction practice of Xiangkou Drainage Station in Boluo County,combined with the technical characteristics of prestressed pipe piles,this paper introduces the construction process and specific quality control measures in detail,and summarizes the construction technical difficulties and precautions for reference.
作者
胡莹
Hu Ying(Huizhou Huayu Water Conservancy and Hydropower Engineering Survey and Design Co.,Ltd.,Huizhou,516000,China)
出处
《长江技术经济》
2021年第6期76-81,共6页
Technology and Economy of Changjiang
关键词
预应力管桩
施工工艺
地基处理
prestressed pipe pile
construction technology
foundation treatment