摘要
介绍了一种在公路桥梁工程中施工现场混凝土的强制拌合浇筑装置及操作方法,主要解决混凝土运输到施工现场出现凝固或者离析等现象时,无法保证混凝土的正常使用,延缓工程工期的难题,该装置和施工方法可以有效的恢复混凝土的性能,避免造成材料的重大浪费,基于企业工程项目的实际应用,方法切实有效,取得了良好的经济效益。
This paper mainly introduces a kind of forced mixing pouring device and operation method of concrete in the construction site of highway and bridge engineering.It mainly solves the problem of solidification or segregation when concrete is transported to the construction site,which cannot ensure the normal use of concrete and delay the construction period.The device and construction method can effectively restore the performance of concrete and avoid major waste of materials.Based on the practical application of enterprise engineering projects,the method is effective and has achieved good economic benefits.
作者
王天成
刘任峰
秦环兵
Wang Tiancheng;Liu Renfeng;Qin Huanbing(Harbin Vocational&Technical College,Harbin 150081,China;China Railway Bridge Bureau Group Second Engineering Co.,Ltd.,Nanjing 210015,China)
出处
《山西建筑》
2022年第3期97-99,共3页
Shanxi Architecture
关键词
混凝土
浇筑装置
操作方法
concrete
pouring device
operation method