大采高工作面支柱支护过空巷技术

Technology of Pillar Support Passing through Empty Roadway in the Working Face with Large Mining Height
下载PDF
导出
摘要 为了确保成庄矿5314大采高工作面顺利通过空巷,采用数值模拟对支柱支护过空巷效果进行分析,设计了支柱支护充填方案和充填系统。现场试验表明,空巷最大顶板下沉量469 mm,两帮收缩量最大为313 mm,整体状况良好,工作面顺利通过空巷。 In order to ensure that the 5314 large mining height face of Chengzhuang Coal Mine passes through the empty roadway smoothly,the effect of pillar support passing through empty roadway is analyzed by numerical simulation,the pillar support filling scheme and filling system are designed.The field test shows that the maximum roof subsidence of the empty roadway is 469 mm,and the maximum shrinkage of the two sides is 313 mm.The overall condition is good,and the working face passes through the empty roadway smoothly.
作者 李云岗 Li Yungang(Sihe Coal Mine of Jinneng Holding Coal Industry Group,Shanxi Jincheng 048000)
出处 《山东煤炭科技》 2022年第1期23-24,27,共3页 Shandong Coal Science and Technology
关键词 大采高 采煤 空巷 支护 large mining height coal mining empty roadway support
  • 相关文献

参考文献4

二级参考文献29

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部