过水隧洞,如水电站导流洞、排水洞、泄洪洞、引水洞等,其底板在运行期间受水流、推移质等冲刷影响较大,为保证工程运行安全,目前大多过水隧洞底板混凝土采用抗冲耐磨技术。结合部分工程成功经验,抗冲耐磨混凝土仅从提高材料性能单方面不足以保证工程运行安全,还需要采用其他综合施工措施。
Overflow tunnels,such as diversion tunnels,drainage tunnels,flood discharge tunnels,diversion tunnels,etc.,have a large impact on the floor slab scouring by water flow and bed load during operation.In order to ensure the safe operation of the project,the anti-scour and wear-resistant technology is mostly used for the bottom slab concrete of overflow tunnel at present.Combining with successful experience of some projects,antiscour and wear-resistant concrete can not only improve material performance unilaterally to ensure safe operation of the project,but also need to adopt other comprehensive construction measures.
作者
徐凤奎
马军林
XU Feng-kui;MA Jun-lin(Power China Guiyang Engineering Corporation Limited,Guiyang 550081,China)
出处
《云南水力发电》
2022年第1期171-174,共4页
Yunnan Water Power
关键词
过水隧洞
抗冲耐磨
混凝土
施工措施
overflow tunnel
erosion and abrasion resistance
concrete