摘要
介绍中东某抽水蓄能电站工程下水库土石坝全库盆土工膜防渗锚固设计。对锚固槽锚固计算过程进行归纳总结,给出相关参数取值参考,为类似工程的土工膜锚固设计提供借鉴。
This paper introduces the anchorage design of the whole reservoir seepage prevention by geomembrane of a pumped storage power station in Middle East,sums up the calculation process of the anchorage groove,and presents relevant parameters,to provide reference for geomembrane anchorage design of similar overseas projects.
作者
张弦
罗书靖
ZHANG Xian;LUO Shujing(PowerChina Huadong Engineering Co.,Ltd.)
出处
《大坝与安全》
2021年第5期6-9,共4页
Dam & Safety
关键词
土工膜
全库盆防渗
锚固设计
海外工程
geomembrane
whole reservoir geomembrane seepage prevention
anchorage design
over-seas project