期刊文献+

隧道二次衬砌质量问题分析与改进措施 被引量:4

Analysis and Improvement Measures of Tunnel Secondary Lining Quality Problems
下载PDF
导出
摘要 针对河北省张家口市在建太子城—锡林浩特铁路太子城至崇礼段小断面隧道施工过程中的二次衬砌厚度不足、背后脱空、混凝土不密实等质量问题,对影响二次衬砌质量的六种因素进行了统计分析。结果显示,二次衬砌厚度不足主要因初期支护不平整引起,而导致初期支护不平整的重要原因是初期支护断面测量测点间距较大。据此提出采用三维激光扫描仪代替光电断面扫描仪测量初期支护断面,对欠挖部位精准凿除后复测,直至该断面无欠挖部位方可浇筑二次衬砌混凝土的改进措施。通过现场检测,采取措施后二次衬砌厚度合格率由78.0%提升至96.7%。 Based on the quality problems of insufficient secondary lining thickness,cavity behind lining,non-dense concrete during the construction of small cross-section tunnel from Taizicheng to Chongli of Taizicheng-Xilinhot railway in Zhangjiakou City,Hebei Province,six factors impacting on secondary lining quality were statistically analyzed. The results show that the insufficient thickness of secondary lining is mainly caused by the unevenness of the primary support,and the important reason leading to the unevenness of the primary support is the large distance between the measurement points for the primary support. Therefore,it is proposed to use 3D laser scanning instead of photoelectric cross-section scanner to measure the primary support cross-section,and re-measure the underbreak section after accurately cutting,and then pour secondary lining concrete until there is no underbreak section. Through on-site inspection,the qualified rate of secondary lining thickness increased from 78.0% to 96.7% after taking measures.
作者 赵风岭 张奇 ZHAO Fengling;ZHANG Qi(Engineering Quality Supervision Station,China Railway Beijing Bureau Group Co.Ltd.,Beijing 100860,China;China Railway 16th Bureau Group Co.Ltd.,Beijing 100018,China)
出处 《铁道建筑》 北大核心 2022年第1期126-129,共4页 Railway Engineering
基金 中国铁路北京局集团有限公司科技研究开发计划项目(2021BG09)。
关键词 铁路隧道 衬砌厚度合格率 统计分析 二次衬砌 地质雷达法 断面复测 三维激光扫描 railway tunnel qualified rate of lining thickness statistical analysis secondary lining ground penetrating radar method cross-section retest 3D laser scanning
  • 相关文献

参考文献8

二级参考文献61

共引文献53

同被引文献33

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部