期刊文献+

某生产期黄金矿山采掘工程造价计价方法应用 被引量:1

Application of cost valuation method in mining project of a gold mine in production period
下载PDF
导出
摘要 基于生产期黄金矿山造价定额与实际发展情况不符的现状,如造价偏高、采矿单价组价困难等问题,研究某生产期黄金矿山采掘工程造价计价方法应用。文章对实际案例进行分析,阐述具体调查实物计价法的计算方式,通过对比造价法,计算两者之间存在的误差,提出具体的参考方式。经过造价对比发现,进行实物调查计价法的单价与实物法之间的降幅为10%~30%之间,其对行业发展有重要作用。 Based on the current situation that gold mine cost norm in production period is not consistent with the actual development situation,such as high cost,difficult mining unit price and other problems,this paper studies the application of mining engineering cost valuation method in a gold mine in production period.The article carries on the analysis to the actual case,expatiates on the concrete investigation object valuation method calculation way,through the comparison cost method,calculates the error that exists between them,proposes the concrete reference way.Through the cost comparison,it is found that the unit price of the physical survey and valuation method decreases by 10% to 30%,which plays an important role in the development of the industry.
作者 陈姝默 CHEN Shu-mo(Changchun Gold Design Institute Co.,LTD.,Changchun 130000,China)
出处 《世界有色金属》 2021年第21期158-159,共2页 World Nonferrous Metals
关键词 工程造价 单价法与实物法 调查 project cost Unit price method and real object method survey
  • 相关文献

二级参考文献15

共引文献14

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部