摘要
本文结合某研发楼深基坑工程项目,深入研究了工程岩土条件和施工技术难点问题,分别从在SMW工法桩、预应力锚索施工两个方面研究施工技术要点,以期为同类工程施工提供有益参考。
Combined with the deep foundation pit engineering project of a R&D building,this paper deeply studies the engineering geotechnical conditions and construction technical difficulties,and studies the key points of construction technology from two aspects of SMW construction method pile and prestressed anchor cable construction,in order to provide reference for the construction of similar projects.
出处
《住宅产业》
2021年第12期85-87,91,共4页
Housing Industry
关键词
SMW工法桩
预应力锚索
深基坑
复杂地质
SMW construction method pile
prestressed anchor cable
deep foundation pit
complex geology