摘要
以广西百色水库灌区输水工程过右江(东笋)大型输水钢管水下沉管为例,介绍DN2200 mm过江输水钢管水下敷设整体沉管的施工过程和特点,总结分析大型过江输水钢管水下敷设整体沉管施工的经验。
The large water transmission steel pipe of Baise Reservoir Irrigation Zone Project crosses Youjiang River.Taking the underwater immersed pipe construction of this large pipe with a diameter of 2200mm as example,an in⁃troduction was made on the construction process and characteristics of across river underwater integral immersed pipe,based on which the author summarized the construction experience.
作者
毛建平
MAO Jian-ping(Sinohydo Bureau 12 Co.,Ltd.,Hangzhou 310004,China)
出处
《广西水利水电》
2022年第1期83-87,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
大型钢管
过江水下敷设
整体沉管
施工经验
百色水库灌区
Large steel pipe
across river underwater laying
integral immersed pipe
construction experience
Baise Reservoir Irrigation Zone